Microgrid demonstration » History » Version 10
Mary Metelko, 04/25/2017 08:37 AM
| 1 | 9 | Mary Metelko | <h1>Microgrid Demonstration</h1> |
|---|---|---|---|
| 2 | 1 | Gabor Karsai | |
| 3 | 5 | Gabor Karsai | <p>Demonstrates how a distributed Microgrid Re-synchronization application can be implemented running on 4 RIAPS nodes</p> |
| 4 | 1 | Gabor Karsai | |
| 5 | <ul> |
||
| 6 | <li>One node is used to capture the data from the system</li> |
||
| 7 | <li>3 nodes are connected to a real-time power grid simulator</li> |
||
| 8 | </ul> |
||
| 9 | |||
| 10 | <p>Primary Control</p> |
||
| 11 | |||
| 12 | <ul> |
||
| 13 | <li>Based on P-f Q-V Droop Control</li> |
||
| 14 | <li>Always in voltage control mode (ensures seamless transition to islanding mode)</li> |
||
| 15 | </ul> |
||
| 16 | |||
| 17 | <p>Secondary Control</p> |
||
| 18 | |||
| 19 | <ul> |
||
| 20 | <li>Restore frequency and voltage</li> |
||
| 21 | </ul> |
||
| 22 | |||
| 23 | 10 | Mary Metelko | <p> </p> |
| 24 | 7 | Gabor Karsai | |
| 25 | 10 | Mary Metelko | <p>{{youtube(C0GLSa933Nw , width=800, height=600, autoplay=true)}}</p> |